Phase 1 / 2 / 3
- Constructed through 3 phases, there are 9 tanks of varying capacities with a total volume of circa 95000 M3
- Terminal has fixed roof tanks, with cone down bottom, fully strippable with road tanker loading and unloading facility through Coriolis Mass Flow Meters.
- Class III (Gas Oil & Fuel Oil) cargo compatible facility with heated and non-heated tanks and blending facility as well.
- Overall opportunity to utilize combinations of facilities as suitable to customers.
- These tanks are operated using state of the art GE SCADA system, SAAB radar gauges and overfill protection system .
- Direct lines to 5 berths of port of Fujairah in additions to pipeline connections to Port’s matrix manifolds.
- Terminal also has a private pipeline connecting Vopak, VTTI and Emarat used for transfer between the terminals.